Product EngineeringVol. 15 · Part XV
0 / 0

Shelves / Product Engineering

PE·187

Product Engineering Projects

Six build-it-yourself projects that practise building the right thing with evidence: a problem brief from real signals, a discovery sprint, a metrics stack in SQL with a metric catalogue, an accessibility and UX audit with fixes, an executable specification with property tests, and a decision log with measured trade-offs, each with milestones, measurable definitions of done and stretch goals.

10 topics · ~5 min read · 5-question quiz
Updated Suggest a correction

How to approach the projects

From "build it right" to "build the right thing, and know it"

These projects use a product you can touch: one you work on, an open-source project, a side project, or TiffinBox using this volume's synthetic dataset. Where real users are needed (interviews, usability tests), recruit a handful of people honestly, get informed consent, and keep what they tell you private.

# Project Main chapters Roughly
1 A problem brief from real signals Start Here, 181 a weekend
2 A discovery sprint 182 1–2 weeks
3 A metrics stack with a catalogue 183 1 week
4 A UX and accessibility audit, fixed 184 1 week
5 An executable specification 185 1 week
6 A decision log with measured trade-offs 186, case studies 1 week

New to product work? Do them in order on one feature; together they reproduce case 1 of the case studies for your own product. Experienced? Do 3, 5 and 6, and use the review rubric to pick the rest.

The working method

  1. Write it down: every project produces artefacts someone else could review.
  2. Evidence over opinion: each claim links to data, a recording note or a test.
  3. Small and real beats big and imaginary: one real feature, a few real users.
  4. Measure the uncertainty: error bars, sample sizes, ranges of estimates.
  5. Close the loop: end each project with a decision and what you'd do next.

The six projects

Project 1: a problem brief from real signals

Goal. A one-page brief for a real problem, built from evidence rather than a feature request.

Milestones. Collect signals (support tickets, reviews, analytics, issue trackers) → cluster them → a problem statement (who, what, why, evidence) → a job story and a research-backed persona → outcome metric and guardrails → three solution options scored with RICE and with uncertainty ranges → the recommended thin slice with acceptance criteria.

Done when. A reviewer who hasn't seen the signals can state the problem, the evidence, the metric to move and the first slice; the brief shows at least 20 signals traced to the problem and P(rank 1) for the top options.

Stretch. Map the user journey with pain points and moments of truth, and show where the problem sits in it.

Project 2: a discovery sprint

Goal. Test the riskiest assumptions behind project 1 in two weeks.

Milestones. Assumption map (importance × evidence) → 5–8 interviews about past behaviour with a discussion guide → affinity synthesis → a clickable prototype → 2 rounds of 5-user usability tests with fixes between → a fake-door or concierge test if a value assumption remains.

Done when. Each risky assumption is marked supported, refuted or unresolved with its evidence; at least one decision changed because of what you learned; usability issues from round 1 are fixed and rechecked in round 2.

Stretch. Design an A/B test for the slice with a pre-registered metric, guardrails and a sample-size calculation.

Project 3: a metrics stack with a catalogue

Goal. Trustworthy product metrics in SQL for one product.

Milestones. A tracking plan (events, properties, owners, privacy class) → events in a database (real or this volume's synthetic data) → SQL for activation, cohort retention, funnel, revenue/ARPU and one engineering metric (DORA or an SLO) → a metric catalogue entry per metric with definition, SQL, owner and caveats → a dashboard.

Done when. Each metric is reproducible from its catalogue SQL; cohort tables only fill mature cells; you've documented two alternative definitions of "active" and why you chose one; a test-account filter is in place.

Stretch. Survival-based LTV (with censoring handled) by channel, compared with acquisition cost.

Project 4: a UX and accessibility audit, fixed

Goal. Measurably better usability and accessibility on one real flow.

Milestones. A heuristic review against Nielsen's ten → an axe-core scan in CI → a keyboard-only pass and a screen-reader pass → three usability sessions on the flow → fixes (semantic HTML, labels, contrast, focus, feedback, errors) → re-audit.

Done when. Zero critical or serious axe violations on the flow; every action works by keyboard with visible focus; first feedback within 100 ms of every action; error messages say what happened and how to fix it; usability task success improves between sessions.

Stretch. Test with a user who relies on assistive technology (with consent and fair compensation) and act on their findings.

Project 5: an executable specification

Goal. Requirements for one feature that run as tests.

Milestones. Business rules elicited from the owners of each constraint → a table of concrete examples per rule, including boundaries and time edge cases → Gherkin scenarios wired to tests → property-based tests for the rules' invariants → measurable non-functional requirements with a check each (latency, accessibility, privacy).

Done when. Every rule has examples and at least one property; the property tests find at least one real issue (or you can show they would find a planted one); each requirements gap found is recorded with the decision made and who made it.

Stretch. A traceability report linking each requirement to its tests and the code that implements it, generated automatically.

Project 6: a decision log with measured trade-offs

Goal. Three architecture decisions for your feature, each backed by a measurement.

Milestones. Identify three decisions (e.g. sync vs async, consistency setting, data model, build vs buy, model API vs self-hosted) → for each, a spike or benchmark that measures the decisive quality → an ADR with context, options, decision, consequences and revisit triggers → a short presentation of the trade-offs in business terms.

Done when. Each ADR cites a reproducible measurement; each lists what would make you revisit it; a non-engineer stakeholder can explain one of the decisions back to you.

Stretch. Revisit an old decision in your codebase whose context has changed, measure it, and write the superseding ADR.

Tracking your progress

Portfolio checklist

Keep briefs, research notes (anonymised), prototypes, SQL, dashboards, audit reports, specifications, tests and ADRs together, with a short README per project. Product-engineering evidence is concrete: "brief from 46 tickets and cohort data; 7 interviews refuted our pricing assumption; usability success 2/5 → 5/5 after one round of fixes; week-4 retention metric certified with SQL and owner; axe criticals 9 → 0 and full keyboard support; property tests found a short-month billing gap the business then resolved; three ADRs with benchmarks" is what makes the portfolio credible.

Mapping to mastery levels

Completing projects 1, 3 and 4 with their checks puts you at L2 across the volume. Doing their stretch goals and explaining every choice is L3–L4. Running projects 2, 5 and 6 on a real feature, so that evidence changed decisions and the decisions are recorded, is L5 work, the level senior and staff engineering roles expect.