CP·213
Capstone Milestones and Evidence
The capstone as a plan you can follow: eight milestones from walking skeleton to failure exercises, each with deliverables, the evidence that proves it, and a review; a schedule at part-time pace; the portfolio that shows the work; reviews to run with someone else; and extensions that connect to Volumes 21–24 (analytics, mobile, internationalisation, senior craft).
Start here: a plan, not a wish list
The capstone requirements are long enough to be paralysing. This chapter turns them into eight milestones, each small enough to finish, each ending with something deployed and evidence that it works. Evidence matters because "I built a production system" is a claim; a trace, a load-test report, a failure-exercise write-up and a recorded demo are proof.
How deep to go
Volume 17 defines six mastery levels. The capstone is where L5 and L6 evidence comes from:
| Milestone stage | Typical level shown |
|---|---|
| M0–M2 | L2–L3 across layers; L4 on transactions and idempotency |
| M3–M5 | L3–L4 on realtime, events and AI |
| M6 | L4–L5 on security, delivery and SLOs |
| M7 | L5–L6: designing for failure and operating through it |
The milestones
| Milestone | Deliverables | Evidence | Typical effort (part-time, 8–10 h/week) |
|---|---|---|---|
| M0 walking skeleton | monorepo; pipeline; cluster via IaC; DNS + TLS; OIDC sign-in; kitchens list from PostgreSQL; trace, dashboard, one alert | a commit deploying to staging and production automatically; a trace from browser to database | 3–4 weeks |
| M1 identity and catalogue | roles; kitchens, menus, allergens; search (PostgreSQL full-text + trigrams); images via signed URLs | authorization tests per endpoint; search latency at 500k dishes; accessibility checks passing | 3 weeks |
| M2 subscriptions and payments | subscribe; skip with cut-off; payments with idempotency keys and a test provider; ledger | concurrency tests (no double skip or charge); payment reconciliation job | 4 weeks |
| M3 kitchen and delivery | kitchen dashboard; rider status; tracking gateway with SSE; positions in Redis | live update within 5 s under load; gateway restart without lost updates | 3 weeks |
| M4 events | outbox; Kafka; notifications, search indexing, analytics workers; DLQ; replay tooling | duplicate-delivery tests; a projection rebuilt by replay; DLQ redrive demo | 3 weeks |
| M5 assistant | ingestion; hybrid retrieval with reranking; tools; bounded agent; evaluation in CI | golden-set results (400+ allergen questions, zero invented claims); cost per conversation | 4–5 weeks |
| M6 hardening | threat model; scanning, SBOMs, signing, admission control; audit log; SLOs and burn-rate alerts; canary and rollback | ZAP baseline clean; unsigned image rejected; canary auto-abort demo; audit tamper drill | 3–4 weeks |
| M7 failure exercises | the twenty exercises of chapters 212A–212B | twenty write-ups with detect/mitigate/recover/prevent; fixes merged; automated ones scheduled | 3–4 weeks |
Total: roughly 7–8 months at part-time pace, after the learning sequence. It's long because it's real; resist adding features before M7 is done.
Milestone reviews
At the end of each milestone, a 45-minute review with someone else (a colleague, a study partner, a mentor):
- Demo the new journeys in the deployed environment (10 minutes).
- Show the evidence: tests, dashboards, traces, reports (10 minutes).
- Walk one request through every layer it touches, explaining each step (10 minutes).
- Questions from the reviewer: "what happens if…?", "why not…?", "how would you know?" (10 minutes).
- Record open risks and actions with owners and dates (5 minutes).
The portfolio
- README: what TiffinBox is, the architecture diagram, how to run it locally in one command, how to deploy.
- Requirements and estimates (chapter 211A) with what was measured against them.
- ADRs for the ten main decisions.
- Evidence folder: load-test reports, failure-exercise write-ups, evaluation results, security reports, cost report.
- Demo videos: one per milestone, 3–5 minutes each.
- A "lessons" document: the surprises (library defaults, proxy limits, silent failures) and what you changed. Interviewers remember these far longer than feature lists.
Extensions
Once M7 is done, extend TiffinBox with the newer volumes:
| Extension | What it adds | Volume |
|---|---|---|
| analytics platform | events → warehouse → dbt models → dashboards for kitchens and finance; stream processing for live kitchen metrics | 21 |
| native mobile app | Android (and iOS) customer app with offline calendar, push notifications, and the same API | 22 |
| internationalisation | Tamil, Telugu, Hindi and English interfaces; time zones for kitchens in other cities; currency formatting | 23 |
| team practices | design docs for each milestone, code-review standards, estimation records, mentoring a second contributor | 24 |
| second region | the region-loss exercise as a real, timed failover | 16, 212A |
| Java and Spring upgrades | moving to the next Java and Spring Boot releases with tests and canaries | 3, 211C |
Done when
- All eight milestones are deployed with their evidence, and each has had a review.
- The portfolio is complete and someone outside the project can run the system from the README.
- You can walk any request through every layer and answer "what if this fails?" for each step.