Shelves / Senior Engineering Craft
SC·08
Senior Engineering Projects
A quarter of senior work on TiffinBox, as six practice projects with deliverables and observable definitions of done: a design doc taken through review to a recorded decision, a code-review practice with team norms and measured latency, a probabilistic forecast for the Dubai launch tracked against actuals, a set of ADRs and a technical-debt register, a mentoring plan with an onboarding path and a knowledge-spread measurement, and a multi-squad project led with WIP limits, dependency tracking and answer-first updates.
Start here: practise on real work
These projects are meant to run alongside your actual job, on your team's real problems; TiffinBox is the stand-in if you need one. Each ends with something another person can see and judge: a document, a decision, a forecast checked against reality, a mentee's progress. Keep a short journal entry for each (what happened, what you did, what you'd change), which becomes evidence of senior-level work at review time.
How deep to go
Volume 17 defines six mastery levels. The projects target L4 across the volume: doing each craft well enough that others rely on you for it.
Project 1: a design doc to decision
Deliverables. A design doc for a real change (for TiffinBox: order events via CDC) with measurable goals, non-goals, at least two honest alternatives, cross-cutting concerns, rollout and rollback; named approvers; a review with a timebox; an ADR recording the decision.
Done when. Every comment is resolved; the decision and approvers are recorded; the checker from chapter 01's lab finds no missing sections; a reviewer confirms the recommendation is clear from the first paragraph.
Project 2: code review practice
Deliverables. Team review norms written down (response time, size guidance, comment labels, approval standard, how AI-generated code is handled); formatters and linters moved into CI; a script reporting PR size and time-to-first-review weekly; one large change you help a teammate split into a stack.
Done when. Median time-to-first-review and median PR size are measured for four weeks before and after the norms, and the team agrees in a retro whether to keep them.
Project 3: forecasting the Dubai launch
Deliverables. A breakdown with a forgotten-work checklist; three-point ranges; a Monte Carlo forecast (chapter 03's model with your parameters) or a throughput forecast; a commitment at a stated confidence with assumptions; a weekly burn-up and re-forecast.
Done when. Stakeholders receive the forecast as a range with assumptions; every re-forecast states what changed; at the end, you record actual vs forecast and adjust your parameters (bias, spread, capacity).
Project 4: decisions and debt
Deliverables. ADRs for the three most significant recent decisions on your team (including the reasoning that wasn't written down); one decision matrix with a sensitivity check and its hinge question answered by the right person; a technical-debt register ranked by interest using change frequency and incident data; one paid-down item with before/after evidence.
Done when. A new team member can explain the three decisions from the ADRs alone; the debt item's interest is measurably lower (e.g. change lead time in that module, or incidents).
Project 5: mentoring and knowledge spread
Deliverables. An onboarding path (day 1, week 1 production change, 90-day plan) tested on a new hire or by a teammate in a fresh environment; regular one-to-ones with one or two mentees, with growth goals; delegated problems with agreed check-ins; the ownership-concentration measurement from chapter 05's lab, a plan for the two most concentrated areas, and a repeat measurement after a quarter.
Done when. The new hire ships to production in week 1; mentees report progress on their goals and take on larger work independently; the concentrated areas have at least two engineers able to change them safely (shown by their merged changes and on-call).
Project 6: leading a multi-squad project
Deliverables. For a project spanning squads (for TiffinBox, Volume 23's i18n work): thin vertical slices, interface contracts agreed early, a dependency tracker, a board with WIP limits, a weekly answer-first status (chapter 06), a launch-readiness review, and a retrospective with owned actions.
Done when. Cycle time and WIP are tracked from start to end; no dependency surprise surfaces later than two weeks before it's needed; stakeholders say in a short survey that updates were clear; the retro's actions are done by the next retro.
Stretch goals
- Lead a real incident as commander and run its blameless postmortem.
- Write a one-year technical strategy for your area, reviewed by a staff engineer.
- Sponsor a colleague into a visible opportunity and help them succeed in it.
- Give an internal talk on one of these crafts, using your own data.